CHANGES IN BUILD 20230630:
Fixed minor bugs
CHANGES IN BUILD 20230630:
Fixed minor bugs
CHANGES IN BUILD 20230628:
CHANGES IN BUILD 20230620:
-Added the calculation of corporate taxes, considering EBIT, interest payment, linear depreciation and amortization.
-Added the possibility to define the inverter-charger power depending on the battery duration wanted, considering only the first inverter-charger of the list.
-In pumped-hydro-storage (PHS), added the possibility to define the water tank or reservoir capacity as the turbine maximum flow multiplied by the duration wanted.
-Added the possibilty to consider the water flow defined in the hydro resource as water inlet in the water tank or reservoir.
-Added more parameters for the electrolyzer electricity consumption and efficiency, with the possibility of obtaining efficiency curves more similar to the real ones.
-Added electrolyzer unavailability in PV systems during night time and in wind systems if there are several consecutive hours with calm wind. After the stop, when the electrolyzer starts again, a cold-start time is considered, and also an extra ageing (in minutes) due to each cold-start.
-Added the possibility to use a fixed value for the hydrogen tank capacity, which is the maximum (in systems where a hydrogen load must be met). In previous versions, the H2 tank capacity was determined at the end of the simulation of each combination, as the minimum necessary.
-Added the possibility to account for the replacement costs of the PV inverter (its own inverter in AC coupled systems), the PV inverter replacement costs will be added to the O&M costs of the PV generator.
-Added ratio rated apparent power / rated active power of the backup generator.
-Added the possibility to update the results table to the present data (simulating again each combination of the results table) when saving the project.
-Added zoom in the electricity price chart which is over the simulation chart (simulation screen)
-Corrected bugs in multi-period optimization of the limitation of the AC power of the PV due to its own inverter.
-Corrected bug when downloading hourly irradiation data from PVGIS, horzontal axis tracking.
-Corrected errors when opening project with sensitivity analysis.
-Corrected bugs with databases changing the currency.
-Corrected bug in optimization of arbitrage with 3 variables (before, in optimization the price limits were < and > and in simulation <= and >=, now both the same, < and >).
-Fixed minor bugs.
-Corrected bug in some cases in the calculation of electricity purchased to the AC grid in systems with DC renewable generation and AC load.
-Corrected bugs in systems with hydrogen load and grid-connected batteries management (energy arbitrage).
-Corrected bugs in systems with electricity load and grid-connected batteries management (energy arbitrage).
-Fixed minor bugs.
CHANGES IN BUILD 20230122:
PREVIOUS CHANGES:
CHANGES IN BUILD 20221223:
CHANGES IN BUILD 20221210:
CHANGES IN BUILD 20221201:
El 22 de noviembre de 2022 se ha publicado la nueva versión 3.4, que incluye:
El 29 de septiembre de 2022 se ha publicado la nueva versión 3.3, que incluye:
El 2 de Abril de 2022 se ha publicado la nueva versión 3.2, que incluye:
Added calculation of direct irradiance when downloading data from databases.
Added graph of direct irradiance.
Added possibility to consider Concentrating PV (CPV) modules or generators.
Corrected bugs when downloading NASA hourly data.
Corrected bugs of multi-objective optimization (when using unmet load as objective).
Corrected bug when calculating back surface irradiation if solar tracking (one or two axis) was selected.
Corrected minor bugs.