Build 2023/12/26

CHANGES IN BUILD 20231226:

  • Added the selection of months for battery availability under arbitrage.
  • Added the possibility to force to pump using AC grid or to use turbine to inject to AC grid regardless arbitrage, with same selection of hours and months as for batteries.
  • Added in the report the number of starts of turbine, pump, fuel cell and electrolyzer.
  • Added in the Excel of the simulation, for each time step and for the total monthly, the incomes of selling hydrogen.
  • Corrected bug in IRR calculation in some cases when adding extra costs.
  • Improved optimization speed in NPV minimization projects.
  • Added in Extra costs the possibility to introduce a value with a fixed annual inflation.
  • In MHOGA, added maximum land use constraint in minimization of NPC projects.
  • Corrected display errors of some graphs in time steps of less than 1 h
  • Fixed minor bugs.