BUILD 2026/03/25


CHANGES IN BUILD 20260325:

  • Fixed bugs in the case of pump-turbine forced to use stored water to supply electrical load not covered by renewables.
  • Fixed bug when optimizing maximum peak power contracted from the grid (after optimizing, when cliking in the simulation values changed).
  • Fixed minor bugs.