We have fixed a bug that affected the calculation of the renewable fraction in some cases where there is AC grid. The EDU version has been updated
New version 2.4
New version 2.4 is available since October 2017. The main news are:
- Possibility to choose priority for supplying the energy not covered by renewables through the AC network or through the batteries/generator
- AC network time availability.
Projects created with version 2.3 can be open by iHOGA 2.4.