Build 2024/04/24

CHANGES IN BUILD 20240424:

  • In NPC minimization projects, added the constraint of the maximum capacity shortage.
  • Added Power Purchase Agreement (PPA) specific price for the PV energy injected to the grid. Also PPA for the Wind turbines generation injected to the grid.
  • Fixed bug when using PHS storage to supply electrical load.
  • Fixed bug when using backup generator to create grid reference.
  • Fixed minor bugs.