CHANGES IN BUILD 20241003:
- Fixed bug when calculating Export (excess) energy in some cases when charging batteries due to the grid limitation.
- Added losses in wire and transformer in Energy purchased to the grid (if the user selects this option).
- Subtracted losses in wire and transformer in Export energy and in Bach-up charge energy (if the user selects these options).