CHANGES IN BUILD 20230122:
- Added the possibility to inject power to the AC grid from the fossil fuel generator (AC generator) in NPV maximizing systems (in generating systems which sell electricity to the grid).
- Added C-rate for grid-connected battery charge / discharge.
PREVIOUS CHANGES:
CHANGES IN BUILD 20221223:
- Fixed minor bugs
- Added minimum capacity of the water tank or reservoir to allow the use of the turbine in PHS systems.
- The user can define if PV AC coupled inverter can limit the AC output power of the PV to the inverter rated power. If not limited, as in previous versions, we assume the inverter can be overcharged.
- Capacity factor when PV is AC coupled uses AC output power of the inverter instead DC PV power.
CHANGES IN BUILD 20221210:
- Added possibility to use electricity sell price inflation instead of general inflation in calculation of LCOE in maximizing NPV projects.
- Fixed minor bugs (bifacial PV, CPV, electrolyzer, fuel cell).
CHANGES IN BUILD 20221201:
- Fixed minor bugs.