CHANGES IN BUILD 20240424:
- In NPC minimization projects, added the constraint of the maximum capacity shortage.
- Added Power Purchase Agreement (PPA) specific price for the PV energy injected to the grid. Also PPA for the Wind turbines generation injected to the grid.
- Fixed bug when using PHS storage to supply electrical load.
- Fixed bug when using backup generator to create grid reference.
- Fixed minor bugs.